Underground Prefabrication and the Joint — Jinxiao Tech (inline-style, rich-text safe) HAIYAN, Jiaxing, Zhejiang, December 2026 — Above ground, prefabrication is settled practice. Below ground it is still the exception, because a basement is where geometry stops repeating, waterproofing meets every joint, and the programme cannot afford a rework. Jinxiao Advanced Materials Technology (Zhejiang) Co., Ltd. has pushed its precast range into that space with the GEPS underground prefabricated integrated system, launched in 2025 with a demonstration base to support it.
Below grade: wall panels standing on the foundation pad, temporary braces holding the line, rebar waiting at the top edge — the setting in which the joint, not the panel, is the risk.
The company came at this from an unusual direction. Founded in November 2016 and recognised as a provincial demonstration base for architectural industrialisation in Zhejiang, it began as a producer of precast reinforced concrete components for building construction and converted itself, by 2019, into an EPC business that designs, manufactures and installs. Its single PC factory building covers 90,000 square metres, which the company describes as the largest single unit of its kind in China, on a total investment of RMB 1.06 billion. Full operation came in 2018, with the capability to produce all types of RC structures.
The joint is the product
For anyone buying precast, the member is the easy part and the connection is the hard part. A grouted coupler sleeve joins two bars inside a void that nobody can see once the grout is in. The failure mode is not dramatic: a sleeve that is 90 per cent full looks exactly like a sleeve that is 100 per cent full from the outside, and the difference shows up months later as a crack at a joint or a load path that does not behave as designed.

Sleeves at a column base, bars inserted, grout ports and hose connection in place — what the inspection can see, and what it can no longer see once the void is filled.
In 2020 Jinxiao developed what it calls the secondary grouting method for couplers and has applied it to all of its installation projects since. The point of a two-stage sequence is that the joint becomes correctable: grout introduced in a second pass can complete a sleeve that the first pass did not fill, instead of the panel being cut open or the connection being written off. It is a small procedural difference with a large commercial consequence, because on a tall residential frame the coupler count runs into the tens of thousands per building.
What the plant makes
The product range that carries this method is the standard kit of a precast frame: composite and laminated slabs, staircases, beams, columns, filler and infill walls, and shear walls. The categories are unremarkable. What is less usual is that the same plant that moulds a stair flight also holds the design file for it, which is where tolerance stack-up gets settled.
Precast element Where the joint decides the outcome Composite / laminated slab Floor and roof decks with a structural topping; the interface between panel and topping is a cast-in-place joint on a precast base. Staircase Flights and landings cast as one piece, seated on the landing beam — a bearing detail rather than a grouted one. Beam Frame and transfer beams, where the beam-to-column connection carries the load path the whole frame depends on. Column Frame columns joined floor to floor through coupler sleeves, the exact detail the grouting method addresses. Filler / infill wall Non-load-bearing enclosure between frame members, where the joint is a sealing and tolerance problem, not a strength one. Shear wall Lateral-force resisting walls in residential and commercial frames, where vertical joints line up across many floors. Stack-up is the quiet killer of precast programmes. Each member is made to its own tolerance, and each is within specification, and the frame still does not close because the tolerances accumulate across a floor. The fix is not tighter moulds; it is designing the members against the joints that will actually be assembled on site, and that only works when design and production sit in one contract.
Design, make, install as one contract
That is the logic behind the EPC model the company adopted in 2019, when it formed its own design team and began offering integrated design-production-installation services. By 2022 its sales had passed RMB 2.3 billion, which puts it in the first tier of the regional industry by its own description, and in the same year it reports completing the optimisation of its reverse-set insulation system.
The client list reads like the Yangtze River Delta construction market compressed into one page. Developers include Poly Real Estate, Vanke, Longfor, China Merchants Shekou and Gemdale. Contractors and regional leaders include Shanghai Construction Group, China State Construction, Shanghai Linwei and Shanghai Zhongjin. Project types run from science parks and commercial buildings in Shanghai to schools, medical facilities and factories. That mix matters, because a school and a factory impose different constraints on the same product: one wants a fast weather-tight envelope, the other wants floor flatness and service penetrations that were designed in rather than drilled later.
The envelope is part of the system
A precast wall is also a weather envelope, and the weak points of an envelope are exactly the points where panels meet. Thermal bridging at a joint, a waterproofing membrane that has to be continued from factory to site, and a sealant that has to survive movement all sit at the same line on the drawing. Insulation cast and finished in the factory moves that work off the scaffold, where it is slow, weather-dependent and hard to inspect, into a plant where it is a process step with a record. The company's 2022 milestone on its reverse-set insulation system points at the same principle the joint method follows: settle the detail upstream.
What a demonstration base is for
The 2025 GEPS launch came with a demonstration base rather than a catalogue, and for a buyer that is the more useful of the two. A joint that is described in a brochure can look convincing and still fail the practical tests a site will apply: whether a wrench and a grout gun reach the connection in the erected position, whether a panel can be lifted without a temporary brace fouling the slab edge, whether the waterproofing detail can actually be applied by the crew on the project.
Where the underground system changes the conversation
A basement wall is a precast member asked to do three jobs at once: hold soil, resist water and accept the tolerances of a foundation that was built before it. Above ground, a precast frame can be argued on speed. Underground, it has to be argued on the joint detail, because that is where the water gets in and where the inspection is hardest.
The questions a buyer should put to any supplier proposing precast below grade are specific:
-
What is the joint geometry at wall-to-wall and wall-to-base, and is there a secondary path for sealing it?
-
How is the waterproofing carried across the joint, and is it applied in the factory or on site?
-
What is the permitted deviation on the panel, and how does it absorb the as-built deviation of the foundation?
-
Where are the lifting points, what does each panel weigh, and what crane does the site actually have?
-
What is the delivery sequence, given that underground precast fails more often from storage and double handling on a congested site than from the mould?
The same list applies above ground, which is why the company's method is worth watching rather than its catalogue. A two-stage grouting procedure, a plant that can make every RC type, and a design team signing the same contract as the factory are three answers to the same problem: the joint, not the panel, decides whether prefabrication works on a project.
Jinxiao's own framing is that the industry should move toward assembly that behaves like a building kit, with modular and Lego-like logic rather than bespoke casting for every project. Whether that is achievable below grade is the open question in the market, and the 2025 GEPS launch is the company's answer to it, supported by a demonstration base rather than a brochure.
Product data, project references and the EPC scope for composite slabs, stairs, beams, columns, filler walls and shear walls are published at www.jinxiaopc.com. Jinxiao Advanced Materials Technology (Zhejiang) Co., Ltd., No. 188 Jiuli Road, Wanghai Street, Haiyan County, Jiaxing, Zhejiang, China · Tel +86 573 8659 8555.